Novellus Tualatin Campus
Contractor(s): Swinerton Construction
Engineer: Oregon Electric Group
Electrical Value: $16 million
Duration: 18 months
Design Build / Assist

This high-tech tool manufacturing facility includes a training facility for research and development of wafer processing equipment. This was a design build project that included everything from power and lighting to telecom, life safety, instrumentation and controls, CCTV and security.








