Oregon Electric Group HeaderblueSpacerEmployee Login
Novellus Tualatin Campus

Contractor(s): Swinerton Construction

Engineer: Oregon Electric Group

Electrical Value: $16 million

Duration: 18 months

Design Build / Assist

This high-tech tool manufacturing facility includes a training facility for research and development of wafer processing equipment. This was a design build project that included everything from power and lighting to telecom, life safety, instrumentation and controls, CCTV and security.